Line in the Sand

Just a quick update with my line in the sand. 

So far…

  • T16 2 litre turbo injected engine with ancillaries
  • Gearbox – stripped
  • Brake and clutch ancillaries removed
  • Seat box and floor panels removed
  • Existing gearbox and engine ready to remove – ideally want the gearbox out to make 1 decent one from 2 ok-ish ones
  • Wheels – powder coated and ready
  • Bonnet and roof stripped
  • Wings sorted and easy remove
  • Radiator out – sell
  • Wiring out

Job list

  • Prep engine for implant
  • Rebuild gearbox
  • Gearbox/engine mating
  • Wiring loom
  • Paint – everything
  • Axle refurb
  • Suspension refurb
  • Brakes
  • Clutch
  • Seats – sell BMW ones
  • Heater – install along with ducting
  • Foot wells – learn to weld 🥺
  • Cooling

Leave a Reply